Search Results

1st Huabei OCTG Machinery Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • East Ring Road 102#, Qingxian County, Hebei Province, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, NDT, Upsetting

  • Valid from:

  • August 22, 2015

  • Valid to:

  • August 21, 2017

  • Registered since:

  • August 22, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility therefore were not assessed.

Australian Pipe Inspection

FACILITY APPROVAL

Inspection

  • Facility:

  • 11 Raymond Avenue, Bayswater, WA 6112 Perth, Australia

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)
    - Inspection, NDT, Testing

  • Inspectors:  

  • Liam Kelly

  • Jason Ross

EXPIRED

  • Valid from:

  • February 09, 2016

  • Valid to:

  • February 08, 2017

  • Registered since:

  • February 09, 2016

  • Standards:

  • Fearnley Procter NS-2™Edition 3 Drill String Inspection Standard for Used Proprietary and Specialised Drilling and Well Completion Equipment

Baoshan Iron & Steel Co., Ltd.; Tube, Pipe and Bar Business Unit

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 885 Fujin Road, Baoshan District, Shanghai, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Valid from:

  • July 21, 2016

  • Valid to:

  • July 20, 2018

  • Registered since:

  • July 21, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Besmindo Australia Pty Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Unit 9, 20 Malcolm Road, Maddington, Perth WA 6109, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

  • Crossover Pup Joints (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • December 10, 2014

  • Valid to:

  • December 09, 2015

  • Registered since:

  • December 10, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 12 Livingstone St, Broome, WA 6725, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • February 26, 2015

  • Valid to:

  • February 25, 2016

  • Registered since:

  • February 26, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Bohai NKK Drill Pipe Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 102 Donghuan Road, Qing County, Cangzhou City, Hebei Province 062658, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Hardbanding

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Threading

  • Valid from:

  • November 24, 2015

  • Valid to:

  • November 23, 2017

  • Registered since:

  • November 24, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Bossong Engineering Pty. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 189 Planet Street, Welshpool, Western Australia, 6725, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • August 10, 2016

  • Valid to:

  • August 09, 2018

  • Registered since:

  • August 10, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 26 McDaniel Road, Minyirr , Western Australia, 6725, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • August 10, 2016

  • Valid to:

  • August 09, 2018

  • Registered since:

  • August 10, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Command Drilling Products USA Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18911 West Industrial Parkway, New Caney, Texas 77357, United States

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • February 15, 2016

  • Valid to:

  • February 14, 2017

  • Registered since:

  • February 15, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18911 West Industrial Parkway, New Caney, Texas 77357, United States

  • Equipment:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Assembly, Inspection, Testing

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

EXPIRED

  • Valid from:

  • February 15, 2016

  • Valid to:

  • February 14, 2017

  • Registered since:

  • February 15, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

DP-Master Manufacturing Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling, Heat Treatment, Inspection, NDT, Threading

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Valid from:

  • April 10, 2016

  • Valid to:

  • April 09, 2018

  • Registered since:

  • March 11, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Valid from:

  • April 10, 2016

  • Valid to:

  • April 09, 2018

  • Registered since:

  • January 21, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Inspection, NDT, Threading

  • Valid from:

  • April 10, 2015

  • Valid to:

  • April 09, 2018

  • Registered since:

  • April 10, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe Body - Sour Service (NS.03.30.10.1110)
    - Heat Treatment, Inspection, Upsetting

  • Drill Pipe - Sour Service (Critical Sour Drilling IRP Vol. 1 Section 1.8)
    - Assembly, Inspection, Testing

  • Valid from:

  • September 17, 2015

  • Valid to:

  • September 16, 2017

  • Registered since:

  • September 17, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Dongying Weima Petroleum Drilling Tools Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • North of Fuqiandajie, East of Quanzhoulu, EDZ, Dongying City, Shandong Province, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Hardbanding, Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling of Threads, Forging, Heat Treatment, Inspection, Machining, Pressure Testing

  • Valid from:

  • February 28, 2017

  • Valid to:

  • February 27, 2019

  • Registered since:

  • June 23, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • North of Fuqiandajie, East of Quanzhoulu, EDZ, Dongying City, Shandong Province, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Testing, Threading

  • Valid from:

  • February 28, 2017

  • Valid to:

  • February 27, 2019

  • Registered since:

  • February 15, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • North of Fuqiandajie, East of Quanzhoulu, EDZ, Dongying City, Shandong Province, People's Republic of China

  • Equipment:

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Hardbanding

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Inspection, Machining

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Valid from:

  • February 28, 2017

  • Valid to:

  • February 27, 2019

  • Registered since:

  • June 23, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Drilltech Oilfield Equipment Manufacturing & Services L.L.C

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Plot No 597 - 538, Dubai Investment Park - 2, P.O. Box 296250 , Dubai, United Arab Emirates

  • Equipment:

  • Drill Collar - Pup Joints, Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)
    - Processes being assessed

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Processes being assessed

  • Substitutes - Bit, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Processes being assessed

  • Substitutes - Crossover, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Processes being assessed

  • Crossovers - High Alloy, Non-Sour (NS.10.35.00.3110)
    - Processes being assessed

  • Crossovers - High Alloy, Sour (NS.10.35.00.3111)
    - Processes being assessed

  • Crossover Pup Joints (NS.03.30.80.1130)
    - Processes being assessed

  • Crossovers - Low Alloy, Sour (NS.10.35.00.1111)
    - Processes being assessed

  • Crossovers - Medium Alloy, Non-Sour (NS.10.35.00.2110)
    - Processes being assessed

  • Crossovers - Medium Alloy, Sour (NS.10.35.00.2111)
    - Processes being assessed

  • Stabilisers - Downhole Adjustable (NS.03.38.82.1110)
    - Processes being assessed

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Processes being assessed

  • Stabilisers - Welded Blade (NS.03.38.78.1110)
    - Processes being assessed

  • Roller Reamer - Angle, Low Alloy, Non-Sour (NS.03.44.60.1110)
    - Processes being assessed

  • Roller Reamer - Straight, Low Alloy, Non-Sour (NS.03.44.60.1110)
    - Processes being assessed

  • Substitutes - Bit, Low Alloy, Non-Sour (NS.03.60.00.1110)

Application Underway

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Grant Prideco (Jiangsu) Drilling Products Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • January 08, 2017

  • Valid to:

  • January 07, 2019

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Valid from:

  • January 08, 2017

  • Valid to:

  • January 07, 2019

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Guizhou Gaofeng Petroleum Machinery Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.22 Changling South Road, Guanshanhu District, Guiyang City, Guizhou Province, 550081, People's Republic of China

  • Equipment:

  • Fishing Jars & Accelerators (NS.07.30.00.1110)
    - Inspection, Machining, Surface Treatment, Testing, Threading

  • Drilling Jars & Accelerators (Hydraulic) (NS.06.42.11.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drilling Jars & Accelerators - (Mechanical) (NS.06.42.17.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Roller Reamer - Angle, Low Alloy, Non-Sour (NS.03.44.60.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Roller Reamer - Straight, Low Alloy, Non-Sour (NS.03.44.60.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Fishing Tools (NS.03.39.00.1110)
    - Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • March 12, 2017

  • Valid to:

  • March 11, 2019

  • Registered since:

  • March 12, 2014

  • Standards:

  • Fearnley International Group Ltd. NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Gaofeng Town, Gui'An New District, Guizhou Province, 550081, People's Republic of China

  • Equipment:

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Kelly Valve Sub (NS.03.35.01.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • March 12, 2017

  • Valid to:

  • March 11, 2019

  • Registered since:

  • March 12, 2014

  • Standards:

  • Fearnley International Group Ltd. NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Hebei Huayouyiji Tuboscope Coating Co. Ltd. (HHTCC) – Jiangyin Facility

FACILITY APPROVAL

Service

  • Facility:

  • Hetun Road West, Shengang Town, Jiangyin City, Jiangsu Province 214443, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TK 34, TK 34XT, DPC, TK 2, TK 7, TK 21 Tubular, TK 33, TK 69, TK 15, TK 70, TK 70XT, TK 34P, TK 216, TK 236, TK 505, TK 800, TK 805

  • Valid from:

  • January 08, 2017

  • Valid to:

  • January 07, 2019

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Hebei Huayouyiji Tuboscope Coating Co. Ltd. (HHTCC) – Qing Xian Facility

FACILITY APPROVAL

Service

  • Facility:

  • No.102 Dong Huan Road Qing County Hebei Province, 062658, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TK 34, TK 34XT, DPC, TK 2, TK 7, TK 21 Tubular, TK 33, TK 69, TK 15, TK 70, TK 70XT, TK 34P, TK 216, TK 236, TK 505, TK 800, TK 805

  • Valid from:

  • January 08, 2017

  • Valid to:

  • January 07, 2019

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Hebei Longway Petroleum Equipment Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Beikou Village, Yingli Town , Jinzhou, Shijiazhuang City, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Processes being assessed

Application Underway

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Beikou Village, Yingli Town , Jinzhou, Shijiazhuang City, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Processes being assessed

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Processes being assessed

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Processes being assessed

Application Underway

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Henan Shenlong Petroleum Drilling Tools Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Yugong South Road, Tech Zone, Jiyuan City, Henan Province, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

Re-approval Assessment in Progress

  • Valid from:

  • July 25, 2016

  • Valid to:

  • July 24, 2017

  • Registered since:

  • July 25, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Yugong South Road, Tech Zone, Jiyuan City, Henan Province, People's Republic of China

  • Equipment:

  • Drill Collars - Non Magnetic, HIgh Alloy, Non-Sour (NS.03.65.00.3110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Collar - Pup Joints, Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

Re-approval Assessment in Progress

  • Valid from:

  • July 25, 2016

  • Valid to:

  • July 24, 2017

  • Registered since:

  • July 25, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Hunting Energy Services Limited

FACILITY APPROVAL

Rental

  • Facility:

  • Unit 1, Hareness Circle, Altens Industrial Estate, AB12 3LY, United Kingdom

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)

  • Drill Collars - Non Magnetic, HIgh Alloy, Non-Sour (NS.03.65.00.3110)

  • Stabilisers - Integral Blade (NS.03.38.82.1110)

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)

  • Stabilisers - Welded Blade (NS.03.38.78.1110)

  • Hole Openers (NS.03.44.58.1110)

  • Stabilisers - Non Magnetic (NS.03.65.00.3110)

SUSPENDED

  • Valid from:

  • November 01, 2015

  • Valid to:

  • October 31, 2017

  • Registered since:

  • November 01, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Jiangsu Shuguang Huayang Drilling Tool Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shuguang Avenue # 18, Baimi Town, Jiangyan District, , Taizhou City, Jiangsu Province, 225532, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Heat Treatment, Inspection, Testing, Upsetting

  • Valid from:

  • March 31, 2017

  • Valid to:

  • March 30, 2019

  • Registered since:

  • February 10, 2011

  • Standards:

  • Fearnley International Group Ltd. NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shuguang Avenue # 18, Baimi Town, Jiangyan District, , Taizhou City, Jiangsu Province, 225532, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Hardbanding

  • Valid from:

  • March 31, 2017

  • Valid to:

  • March 30, 2019

  • Registered since:

  • June 11, 2012

  • Standards:

  • Fearnley International Group Ltd. NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Jiangsu Shuguang Oil Tools Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shuguang Avenue # 18, , Baimi Town, Jiangyan District, Taizhou City, Jiangsu Province, 225532 , People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, NDT, Threading

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, NDT

  • Valid from:

  • June 11, 2017

  • Valid to:

  • June 10, 2019

  • Registered since:

  • June 11, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility therefore were not assessed.

Jiangsu TSC Coating Co. Ltd.

FACILITY APPROVAL

Service

  • Facility:

  • Shuguang Industrial Park, Shuguang Road, Baimi Town, Jiangyan City, Jiangsu Province, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TC 2000

EXPIRED

  • Valid from:

  • February 10, 2015

  • Valid to:

  • February 09, 2017

  • Registered since:

  • November 14, 2006

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Jiangyin Hengyang Petroleum Machinery Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.888, Yangzi River Road, Huangtu Town, Jiangyin City, Jiangsu, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling, Forging, Heat Treatment, Inspection, Machining, Threading

  • Valid from:

  • September 30, 2015

  • Valid to:

  • September 29, 2017

  • Registered since:

  • September 30, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility and therefore were not assessed.

Jiangyin Long-Bright Drill Pipe Manufacture Co. Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.820, Binjiang West Road, Ligang Town, Jiangyin City, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Hardbanding

EXPIRED

  • Valid from:

  • January 26, 2015

  • Valid to:

  • January 25, 2017

  • Registered since:

  • January 26, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Jiangyin Yashen Petroleum Pipe Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No 95, Xili Road,, Ligang Town, Jiangyin, Jiangsu, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Forging, Heat Treatment, Inspection, Testing, Threading

EXPIRED

  • Valid from:

  • February 08, 2015

  • Valid to:

  • February 07, 2016

  • Registered since:

  • February 08, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility and therefore were not assessed.

Knight Oil Tools Tri*Drill Services

FACILITY APPROVAL

Service

  • Facility:

  • 1001, Briar Patch Road,, Broussard,, Louisiana 70518, United States

  • Service:

  • Hardbanding Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • Tritanium, Duraband NC, Tuffband NC, Stoody HB 56

EXPIRED

  • Valid from:

  • May 01, 2014

  • Valid to:

  • April 30, 2016

  • Registered since:

  • May 01, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Inspection

  • Facility:

  • 1001, Briar Patch Road,, Broussard,, Louisiana 70518, United States

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)
    - Inspection

  • Inspectors:  

  • Hillman Mouton

  • Jeremy Landry

Re-approval Assessment in Progress

  • Valid from:

  • June 01, 2012

  • Valid to:

  • May 31, 2014

  • Registered since:

  • June 01, 2012

  • Standards:

  • Fearnley Procter NS-2™Edition 3 Drill String Inspection Standard for Used Proprietary and Specialised Drilling and Well Completion Equipment

Nantong Yongda Pipe Industry Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No 111, Kaiyuan Road, Hai’an Industry Park, Hai’an Country, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Machining, Testing, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Assembly, Inspection, Testing

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Heat Treatment, Machining, Testing

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

  • Valid from:

  • April 24, 2017

  • Valid to:

  • April 23, 2018

  • Registered since:

  • April 24, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

OTTO FUCHS KG

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Derschlager Strabe 26, 58540 Meinerzhagen , Germany

  • Equipment:

  • Drill Pipe - Aluminium with Shrink Fit Tool Joints, HIgh Alloy (NS.03.30.80.7110)
    - Assembly, Extrusion, Heat Treatment, Inspection, Solution Heat Treatment, Testing

  • Valid from:

  • September 11, 2016

  • Valid to:

  • September 10, 2018

  • Registered since:

  • September 11, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PLCO Manufacture Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.1201, Zhencheng Road, Shen-gang Town, Jiangyin City,, Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Forging, Heat Treatment, Inspection, Testing, Threading

EXPIRED

  • Valid from:

  • September 30, 2014

  • Valid to:

  • September 29, 2016

  • Registered since:

  • September 30, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Paradigm Drilling Services

FACILITY APPROVAL

Rental

  • Facility:

  • Caimiestone Road, , Thainstone, Inverurie,, Scotland, United Kingdom

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)

  • Drill Collars - Non Magnetic, HIgh Alloy, Non-Sour (NS.03.65.00.3110)

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)

  • Stabilisers - Integral Blade (NS.03.38.82.1110)

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)

  • Stabilisers - Welded Blade (NS.03.38.78.1110)

EXPIRED

  • Valid from:

  • December 17, 2015

  • Valid to:

  • December 16, 2016

  • Registered since:

  • December 17, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Caimiestone Road, , Thainstone, Inverurie,, Scotland, United Kingdom

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Collars - Non Magnetic, HIgh Alloy, Non-Sour (NS.03.65.00.3110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Stabilisers - Welded Blade (NS.03.38.78.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • December 17, 2015

  • Valid to:

  • December 16, 2016

  • Registered since:

  • December 17, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Petromaterials (Cangzhou) Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Machining, Surface Treatment, Threading

  • Crossover Pup Joints (NS.03.30.80.1130)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • May 14, 2016

  • Valid to:

  • May 13, 2018

  • Registered since:

  • May 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Cold Rolling of Threads, Forging, Heat Treatment, Inspection, Machining, Surface Treatment, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Machining, Testing

  • Valid from:

  • May 14, 2016

  • Valid to:

  • May 13, 2018

  • Registered since:

  • May 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Pipe & Drilling Tools Manufacture Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Petro & High-Tech Industrial Park Economic Development Zone, Panjin City, Liaoning 124013, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Hardbanding

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Hardbanding, Heat Treatment, Inspection, Machining, Testing, Threading

  • Valid from:

  • August 22, 2015

  • Valid to:

  • August 21, 2017

  • Registered since:

  • August 22, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Rotary Drilling Tools USA LLC

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 9022 Vincik Ehlert, Beasley , TX 77414, United States

  • Equipment:

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Processes being assessed

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Processes being assessed

EXPIRED

  • Valid from:

  • April 28, 2015

  • Valid to:

  • April 27, 2016

  • Registered since:

  • April 28, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 9022 Vincik Ehlert, Beasley , TX 77414, United States

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • April 28, 2015

  • Valid to:

  • April 27, 2016

  • Registered since:

  • April 28, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Schlumberger Drilling Tools & Remedial

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 1310 Rankin Road, Houston, Texas 77073, United States

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • November 25, 2015

  • Valid to:

  • November 24, 2017

  • Registered since:

  • November 25, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 1310 Rankin Road, Houston, Texas 77073, United States

  • Equipment:

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Inspection, Machining

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

  • Valid from:

  • November 25, 2015

  • Valid to:

  • November 24, 2017

  • Registered since:

  • November 25, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Shanghai Hilong Drill Pipe Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.1825 Luodong Road, Baoshan Industrial Zone, Shanghai, 200949, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Testing, Threading

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

  • Valid from:

  • January 15, 2016

  • Valid to:

  • January 14, 2018

  • Registered since:

  • June 01, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

  • Fearnley Procter NS-1™ Level 4 - Hardbanding and Internal Plastic Coating are not applied at this facility therefore were not assessed.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.1825 Luodong Road, Baoshan Industrial Zone, Shanghai, 200949, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Threading

  • Valid from:

  • January 15, 2016

  • Valid to:

  • January 14, 2018

  • Registered since:

  • January 15, 2009

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Shanghai Tianhe Oil Engineering Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 2999 Xinyang Road Fengxian District, Shanghai, 201413, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • October 12, 2015

  • Valid to:

  • October 11, 2016

  • Registered since:

  • October 12, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 2999 Xinyang Road Fengxian District, Shanghai, 201413, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Heat Treatment, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • October 12, 2015

  • Valid to:

  • October 11, 2016

  • Registered since:

  • October 12, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 2999 Xinyang Road Fengxian District, Shanghai, 201413, People's Republic of China

  • Equipment:

  • Drill Collars - Non Magnetic, HIgh Alloy, Non-Sour (NS.03.65.00.3110)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • October 12, 2015

  • Valid to:

  • October 11, 2016

  • Registered since:

  • October 12, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Shanghai Tube-Cote Petroleum Pipe Coating Co., Ltd.

FACILITY APPROVAL

Service

  • Facility:

  • 669 Jinle Road, Yuepu Industry Park, Baoshan District,Shanghai, 200941, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TC 2000

Re-approval Assessment in Progress

  • Valid from:

  • March 30, 2015

  • Valid to:

  • March 29, 2017

  • Registered since:

  • November 14, 2006

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Shanxi Fenglei Drilling Tools Co., Ltd. (Shanxi North Fenglei Industrial Group Co., Ltd.)

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Heat Treatment, Inspection, Testing, Upsetting

Re-approval Assessment in Progress

  • Valid from:

  • March 29, 2015

  • Valid to:

  • March 28, 2017

  • Registered since:

  • March 29, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

Re-approval Assessment in Progress

  • Valid from:

  • April 10, 2015

  • Valid to:

  • April 09, 2017

  • Registered since:

  • April 10, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Equipment:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Heat Treatment, Inspection, Machining, Testing, Threading

Re-approval Assessment in Progress

  • Valid from:

  • April 10, 2015

  • Valid to:

  • April 09, 2017

  • Registered since:

  • April 10, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

Re-approval Assessment in Progress

  • Valid from:

  • March 29, 2015

  • Valid to:

  • March 28, 2017

  • Registered since:

  • March 29, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Sub-drill Supply Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Endeavour Drive, Arnhall Business Park, Westhill, Aberdeenshire , AB32 6UF, Scotland, United Kingdom

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Processes being assessed

  • Substitutes - Crossover, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Processes being assessed

  • Substitutes - Bit, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Processes being assessed

Re-approval Assessment in Progress

  • Valid from:

  • May 02, 2016

  • Valid to:

  • May 01, 2017

  • Registered since:

  • May 02, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Endeavour Drive, Arnhall Business Park, Westhill, Aberdeenshire , AB32 6UF, Scotland, United Kingdom

  • Equipment:

  • Top Drive Saver Subs (NS.03.60.00.1120)
    - Processes being assessed

Application Underway

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Subsidiary Enterprise - Drill Collars and Kellys Plant

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 2, Komarova Street Sumy, 40020, Ukraine

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Valid from:

  • October 20, 2015

  • Valid to:

  • October 19, 2017

  • Registered since:

  • October 20, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 2, Komarova Street Sumy, 40020, Ukraine

  • Equipment:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Hardbanding, Heat Treatment, Inspection, Machining, Testing, Threading

  • Valid from:

  • October 20, 2015

  • Valid to:

  • October 19, 2017

  • Registered since:

  • October 20, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Surbo Tubular Services, Inc

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 8861 Park Ave, Houma, Louisiana 70363, United States

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Top Drive Saver Subs (NS.03.60.00.1120)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Testing, Threading

  • Valid from:

  • February 14, 2017

  • Valid to:

  • February 13, 2018

  • Registered since:

  • February 14, 2017

  • Standards:

  • Fearnley Procter NS-2™Edition 3 Drill String Inspection Standard for Used Proprietary and Specialised Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

TSP Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No 34-74 Sanggae-ro, Nam-gu, Ulsan, South Korea

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Inspection, Machining, Testing, Threading

  • Valid from:

  • December 15, 2015

  • Valid to:

  • December 14, 2017

  • Registered since:

  • December 15, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No 34-74 Sanggae-ro, Nam-gu, Ulsan, South Korea

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Valid from:

  • October 08, 2016

  • Valid to:

  • October 07, 2018

  • Registered since:

  • October 08, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Tianhe Oil Group Huifeng Petroleum Equipment Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 101, Committee 1,, Xinhua Bei, Hailing City,, Mudanjiang, Heilongjiang, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

SUSPENDED

  • Valid from:

  • June 13, 2012

  • Valid to:

  • June 12, 2013

  • Registered since:

  • November 05, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Vallourec Drilling Products France

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Aulnoye-Aymeries Facility, 62 rue de Leval, 59620 Aulnoye, France

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Valid from:

  • June 04, 2016

  • Valid to:

  • June 03, 2018

  • Registered since:

  • June 04, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • ZA Du Tremblat, Route De Villechaud , 58200 Cosne Sur Loire, France

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • January 12, 2016

  • Valid to:

  • January 11, 2017

  • Registered since:

  • January 12, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 7 Rue des Frères Lumière,, 58200 Cosne sur Loire, France

  • Equipment:

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Crossover Pup Joints (NS.03.30.80.1130)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Kelly Valve Sub (NS.03.35.01.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • January 12, 2016

  • Valid to:

  • January 11, 2017

  • Registered since:

  • January 12, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Zhongyuan Special Steel Co., Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Xiaozhai Village, Chengliu Town, Jiyuan City, , Henan Province, 459008, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Hardbanding, Heat Treatment, Inspection, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Collars - Non Magnetic, HIgh Alloy, Non-Sour (NS.03.65.00.3110)
    - Forging, Heat Treatment, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Collars - Non Magnetic, HIgh Alloy, Non-Sour (NS.03.65.00.3110)
    - Cold Rolling of Threads, Cold Working of Stress Relief Features, Forging, Inspection, Machining, Testing, Threading

  • Valid from:

  • June 20, 2016

  • Valid to:

  • June 19, 2018

  • Registered since:

  • June 20, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Bohai NKK Drill Pipe Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 102 Donghuan Road, Qing County, Cangzhou City, Hebei Province 062658, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • November 24, 2015

  • Valid to:

  • November 23, 2017

  • Registered since:

  • November 24, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 102 Donghuan Road, Qing County, Cangzhou City, Hebei Province 062658, People's Republic of China

  • Product(s):

  • Arnco 350XT

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • August 10, 2016

  • Valid to:

  • August 09, 2017

  • Registered since:

  • August 10, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

CJWinter

PROCESS APPROVAL

Equipment process

  • Process:

  • Cold Root Rolling of Rotary Shouldered Connections

  • Equipment:

  • Rotary Shouldered Connections (NS.03.30.00.1110)

  • Valid from:

  • September 10, 2016

  • Valid to:

  • September 09, 2018

  • Registered since:

  • September 10, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Castolin Eutectic Oiltec Division

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • OTW 12Ti

  • Product(s) re-applied over:

  • OTW 12Ti

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )

  • Valid from:

  • August 16, 2015

  • Valid to:

  • August 15, 2017

  • Registered since:

  • August 16, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Hardbanding on the Centre Wear Pads of Non-Welded Heavy Weight Drill Pipe (NS.03.30.80.1120) and Heavy Weight Drill Pipe with Welded Tool Joints (NS.03.30.80.1120)

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • OTW 13CF

  • Product(s) re-applied over:

  • OTW 13CF

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )

  • Valid from:

  • September 22, 2015

  • Valid to:

  • September 21, 2017

  • Registered since:

  • September 22, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • OTW 13CF

  • Product(s) re-applied over:

  • TCS Titanium

  • Arnco 350XT

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • August 16, 2016

  • Valid to:

  • August 15, 2017

  • Registered since:

  • August 16, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe with Welded Tool Joints.

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • OTW 12Ti

  • Product(s) re-applied over:

  • TCS Titanium

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • August 16, 2016

  • Valid to:

  • August 15, 2017

  • Registered since:

  • August 16, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe with Welded Tool Joints.

DP-Master Manufacturing Co. Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • April 10, 2016

  • Valid to:

  • April 09, 2018

  • Registered since:

  • March 11, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Dongying Weima Petroleum Drilling Tools Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • North of Fuqiandajie, East of Quanzhoulu, EDZ, Dongying City, Shandong Province, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • February 28, 2017

  • Valid to:

  • February 27, 2019

  • Registered since:

  • June 23, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Internal Plastic Coating as part of manufacture

  • Facility:

  • North of Fuqiandajie, East of Quanzhoulu, EDZ, Dongying City, Shandong Province, People's Republic of China

  • Product(s):

  • WT300 and WT300P

  • Valid from:

  • June 17, 2016

  • Valid to:

  • June 16, 2018

  • Registered since:

  • June 17, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • North of Fuqiandajie, East of Quanzhoulu, EDZ, Dongying City, Shandong Province, People's Republic of China

  • Product(s):

  • TCS 8000

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • February 28, 2017

  • Valid to:

  • February 27, 2019

  • Registered since:

  • June 23, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Drilltech Oilfield Equipment Manufacturing & Services L.L.C

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Plot No 597 - 538, Dubai Investment Park - 2, P.O. Box 296250 , Dubai, United Arab Emirates

  • Product(s):

  • Arnco 100XT

  • Arnco 150XT

  • Arnco 300XT

  • Arnco 350XT

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

Application Underway

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Plot No 597 - 538, Dubai Investment Park - 2, P.O. Box 296250 , Dubai, United Arab Emirates

  • Product(s):

  • Armacor

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

Application Underway

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Durum Verschleiss-Schutz GmbH

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • Durum FD 665

  • Product(s) re-applied over:

  • Durum FD 665

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • February 28, 2016

  • Valid to:

  • February 27, 2018

  • Registered since:

  • February 28, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Grant Prideco (Jiangsu) Drilling Products Co. Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • Arnco 150XT

  • Arnco 350XT

  • Duraband NC

  • TCS Titanium

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • January 08, 2017

  • Valid to:

  • January 07, 2019

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Product(s):

  • TCS 8000

  • Smooth X

  • Platinum HB

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • January 08, 2017

  • Valid to:

  • January 07, 2019

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Product(s):

  • Arnco 350XT

  • Duraband NC

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

Re-approval Assessment in Progress

  • Valid from:

  • April 14, 2015

  • Valid to:

  • January 07, 2019

  • Registered since:

  • April 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Hebei Longway Petroleum Equipment Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Beikou Village, Yingli Town , Jinzhou, Shijiazhuang City, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • Arnco 350XT

  • TCS Titanium

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

Application Underway

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Hilong Petroleum Pipe Company LLC

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Industrial City, Abu Dhabi, United Arab Emirates

  • Product(s):

  • BoTn 1000

  • BoTn 3000

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • January 12, 2017

  • Valid to:

  • January 11, 2018

  • Registered since:

  • January 12, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Internal Plastic Coating as part of manufacture

  • Facility:

  • Industrial City, Abu Dhabi, United Arab Emirates

  • Product(s):

  • TC 2000

  • Valid from:

  • January 12, 2017

  • Valid to:

  • January 11, 2018

  • Registered since:

  • January 12, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Hunting Energy Services Limited

PROCESS APPROVAL

Wear Band application

  • Facility:

  • Unit 1, Hareness Circle, Altens Industrial Estate, AB12 3LY, United Kingdom

  • Product(s):

  • Wear Band

SUSPENDED

  • Valid from:

  • November 01, 2015

  • Valid to:

  • October 31, 2017

  • Registered since:

  • November 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Jiangsu Shuguang Huayang Drilling Tool Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shuguang Avenue # 18, Baimi Town, Jiangyan District, , Taizhou City, Jiangsu Province, 225532, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • OTW 12Ti

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Valid from:

  • March 31, 2017

  • Valid to:

  • March 30, 2019

  • Registered since:

  • June 11, 2012

  • Standards:

  • Fearnley International Group Ltd. NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Jiangyin Long-Bright Drill Pipe Manufacture Co. Ltd

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No.820, Binjiang West Road, Ligang Town, Jiangyin City, Jiangsu Province, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • January 26, 2015

  • Valid to:

  • January 25, 2017

  • Registered since:

  • January 26, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Petromaterials (Cangzhou) Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Product(s):

  • TCS Titanium

  • Arnco 350XT

  • Arnco 100XT

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Valid from:

  • May 14, 2016

  • Valid to:

  • May 13, 2018

  • Registered since:

  • May 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Pipe & Drilling Tools Manufacture Co. Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Petro & High-Tech Industrial Park Economic Development Zone, Panjin City, Liaoning 124013, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • Arnco 350XT

  • BoTn 3000

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • August 22, 2015

  • Valid to:

  • August 21, 2017

  • Registered since:

  • August 22, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Postle Industries, Inc.

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • Duraband NC

  • Product(s) re-applied over:

  • Smooth X

  • Duraband NC

  • Armacor

  • TCS Titanium

  • TCS 8000

  • Tuffband NC

  • Arnco 150XT

  • Arnco 350XT

  • Arnco 100XT

  • OTW 12Ti

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Valid from:

  • March 17, 2017

  • Valid to:

  • March 16, 2019

  • Registered since:

  • December 11, 2009

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe with Welded Tool Joints (NS.03.30.80.1110).

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • Tuffband NC

  • Product(s) re-applied over:

  • Smooth X

  • Tuffband NC

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Valid from:

  • March 16, 2017

  • Valid to:

  • March 15, 2019

  • Registered since:

  • March 16, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe with Welded Tool Joints (NS.03.30.80.1110).

Shanghai Tianhe Oil Engineering Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No. 2999 Xinyang Road Fengxian District, Shanghai, 201413, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • Arnco 150XT

  • Arnco 300XT

  • Arnco 350XT

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • October 12, 2015

  • Valid to:

  • October 11, 2016

  • Registered since:

  • October 12, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Shanghai Tube-Cote Petroleum Pipe Coating Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 669 Jinle Road, Yuepu Industry Park, Baoshan District,Shanghai, 200941, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • Arnco 150XT

  • BoTn 1000

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

Re-approval Assessment in Progress

  • Valid from:

  • July 17, 2015

  • Valid to:

  • July 16, 2017

  • Registered since:

  • July 17, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 669 Jinle Road, Yuepu Industry Park, Baoshan District,Shanghai, 200941, People's Republic of China

  • Product(s):

  • BoTn 3000

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

Re-approval Assessment in Progress

  • Valid from:

  • May 25, 2015

  • Valid to:

  • May 24, 2016

  • Registered since:

  • March 25, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Shanxi Fenglei Drilling Tools Co., Ltd. (Shanxi North Fenglei Industrial Group Co., Ltd.)

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

Re-approval Assessment in Progress

  • Valid from:

  • March 29, 2015

  • Valid to:

  • March 28, 2017

  • Registered since:

  • March 29, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Subsidiary Enterprise - Drill Collars and Kellys Plant

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 2, Komarova Street Sumy, 40020, Ukraine

  • Product(s):

  • Relit

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • October 20, 2015

  • Valid to:

  • October 19, 2017

  • Registered since:

  • December 20, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 2, Komarova Street Sumy, 40020, Ukraine

  • Product(s):

  • Arnco 150XT

  • Arnco 350XT

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

Re-approval Assessment in Progress

  • Valid from:

  • October 20, 2015

  • Valid to:

  • October 19, 2016

  • Registered since:

  • October 20, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Vallourec Drilling Products France

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Aulnoye-Aymeries Facility, 62 rue de Leval, 59620 Aulnoye, France

  • Product(s):

  • Arnco 100XT

  • Arnco 350XT

  • Duraband NC

  • OTW 12Ti

  • TCS Titanium

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • June 04, 2016

  • Valid to:

  • June 03, 2018

  • Registered since:

  • June 04, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Aulnoye-Aymeries Facility, 62 rue de Leval, 59620 Aulnoye, France

  • Product(s):

  • Armacor

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • June 04, 2016

  • Valid to:

  • June 03, 2018

  • Registered since:

  • June 04, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • ZA Du Tremblat, Route De Villechaud , 58200 Cosne Sur Loire, France

  • Product(s):

  • Procasing

  • Duraband NC

  • OTW 12Ti

  • Arnco 100XT

  • Arnco 350XT

  • TCS Titanium

  • Equipment:

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • January 12, 2016

  • Valid to:

  • January 11, 2017

  • Registered since:

  • January 12, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • ZA Du Tremblat, Route De Villechaud , 58200 Cosne Sur Loire, France

  • Product(s):

  • Armacor

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • January 12, 2016

  • Valid to:

  • January 11, 2017

  • Registered since:

  • January 12, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Zhongyuan Special Steel Co., Ltd

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Xiaozhai Village, Chengliu Town, Jiyuan City, , Henan Province, 459008, People's Republic of China

  • Product(s):

  • Arnco 100XT

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • June 20, 2016

  • Valid to:

  • June 19, 2018

  • Registered since:

  • August 12, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Arnco Technology Trust Ltd.

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • Arnco 300XT

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • January 06, 2016

  • Valid to:

  • January 05, 2018

  • Registered since:

  • December 05, 2003

NS-1™ Level 3 Certificate No: 006/16-3

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • Arnco 100XT

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • January 06, 2016

  • Valid to:

  • January 05, 2018

  • Registered since:

  • August 15, 2002

NS-1™ Level 2 Certificate No: 007/16-2

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • Arnco 150XT

  • For:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )

  • Valid from:

  • January 06, 2016

  • Valid to:

  • January 05, 2018

  • Registered since:

  • January 06, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • Arnco 350XT

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • January 06, 2016

  • Valid to:

  • January 05, 2018

  • Registered since:

  • April 29, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Castolin Eutectic Oiltec Division

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • OTW 12Ti

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • August 16, 2015

  • Valid to:

  • August 15, 2017

  • Registered since:

  • August 16, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • OTW 13CF

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • September 22, 2015

  • Valid to:

  • September 21, 2017

  • Registered since:

  • September 22, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Dongying Weima Petroleum Drilling Tools Co., Ltd.

PRODUCT APPROVAL

Internal Plastic Coating plus its initial application

  • Product:

  • WT300P

  • For:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • September 21, 2016

  • Valid to:

  • September 20, 2018

  • Registered since:

  • September 21, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PRODUCT APPROVAL

Internal Plastic Coating plus its initial application

  • Product:

  • WT300

  • For:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • September 21, 2016

  • Valid to:

  • September 20, 2018

  • Registered since:

  • September 21, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Durum Verschleiss-Schutz GmbH

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • Durum FD 665

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • February 28, 2016

  • Valid to:

  • February 27, 2018

  • Registered since:

  • February 28, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • Durum FD 653

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • February 28, 2016

  • Valid to:

  • February 27, 2018

  • Registered since:

  • February 28, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Knight Oil Tools Tri*Drill Services

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • Tritanium

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

EXPIRED

  • Valid from:

  • April 20, 2014

  • Valid to:

  • April 19, 2016

  • Registered since:

  • April 20, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

NOV Tuboscope

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • TCS Titanium

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • October 20, 2016

  • Valid to:

  • October 19, 2018

  • Registered since:

  • October 20, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Postle Industries, Inc.

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • Duraband NC

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • July 22, 2017

  • Valid to:

  • July 21, 2019

  • Registered since:

  • July 22, 2008

NS-1™ Level 2 Certificate No: 004/17-2

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • Tuffband NC

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • July 22, 2017

  • Valid to:

  • July 21, 2019

  • Registered since:

  • July 22, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Shanghai BoTeng Welding Consumables Co., Ltd.

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • BoTn 5000

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • December 01, 2016

  • Valid to:

  • November 30, 2018

  • Registered since:

  • December 01, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • BoTn 3000

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • October 01, 2015

  • Valid to:

  • September 30, 2017

  • Registered since:

  • October 01, 2007

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • BoTn 1000

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • October 01, 2015

  • Valid to:

  • September 30, 2017

  • Registered since:

  • October 01, 2007

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Stoody Company

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • Stoody HB 56

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • January 27, 2017

  • Valid to:

  • January 26, 2019

  • Registered since:

  • January 27, 2012

  • Standards:

  • Fearnley International Group Ltd. NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

Vallourec Drilling Products France

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • Procasing

  • For:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Valid from:

  • July 10, 2016

  • Valid to:

  • July 09, 2018

  • Registered since:

  • July 09, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Welding Alloys Group

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • DRILL-GUARD Ti™

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • August 17, 2016

  • Valid to:

  • August 16, 2017

  • Registered since:

  • August 17, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • DRILL-GUARD Nb™

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • August 17, 2016

  • Valid to:

  • August 16, 2017

  • Registered since:

  • August 17, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

PRODUCT APPROVAL

Hardbanding plus its initial application

  • Product:

  • DRILL-GUARD CC™

  • For:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • August 17, 2016

  • Valid to:

  • August 16, 2017

  • Registered since:

  • August 17, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DP-Master Manufacturing (S) Pte Ltd.

DESIGN APPROVAL

Rotary connections

  • Name:

  • MT39 Double Shouldered Rotary Drilling Connection (NS.03.30.00.1110)

  • Valid from:

  • February 05, 2016

  • Valid to:

  • February 04, 2018

  • Registered since:

  • February 05, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Rotary connections

  • Name:

  • DPM-DS50 Rotary Connection Design Review and Compatibility with GPDS50 (NS.03.30.00.1110)

  • Valid from:

  • April 28, 2017

  • Valid to:

  • April 27, 2019

  • Registered since:

  • April 28, 2016

  • Standards:

  • Fearnley International Group Ltd. NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • DPM-DS55 Rotary Connection Design Review and Compatibility with GPDS55 (NS.03.30.00.1110)

  • Valid from:

  • April 28, 2017

  • Valid to:

  • April 27, 2019

  • Registered since:

  • April 28, 2016

  • Standards:

  • Fearnley International Group Ltd. NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • DPM-ST® 39 rotary connection, manufactured from 120 kpsi material. Design Review and Compatibility Assessment with GP-XT39 (120 kpsi material). (NS.03.30.00.1110)

  • Valid from:

  • September 15, 2016

  • Valid to:

  • September 14, 2017

  • Registered since:

  • September 15, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Rotary connections

  • Name:

  • DPM-DS55 Double Shouldered Rotary Drilling Connection ( NS.03.30.00.1110)

EXPIRED

  • Valid from:

  • June 26, 2015

  • Valid to:

  • June 25, 2017

  • Registered since:

  • June 26, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DP-Master Manufacturing Co. Ltd.

DESIGN APPROVAL

Equipment

  • Name:

  • Sour Service Drill Pipe (Critical Sour Drilling IRP Vol. 1 Section 1.8)

  • Valid from:

  • September 17, 2015

  • Valid to:

  • September 16, 2017

  • Registered since:

  • September 17, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DSI FZE

DESIGN APPROVAL

Equipment

  • Name:

  • PBL Bypass Systems

Application Underway

Don Mashburn Inc.

DESIGN APPROVAL

Equipment

  • Name:

  • 15000 psi Kelly Valve Sub (DMV-337/Kit 1) (NS.03.35.01.1110)

Re-approval Assessment in Progress

  • Valid from:

  • May 01, 2015

  • Valid to:

  • April 30, 2017

  • Registered since:

  • May 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Equipment

  • Name:

  • Down Hole Filter Subs. (NS.03.60.00.1110)

Re-approval Assessment in Progress

  • Valid from:

  • May 01, 2015

  • Valid to:

  • April 30, 2017

  • Registered since:

  • November 28, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Frank's International LLC

DESIGN APPROVAL

Equipment

  • Name:

  • HI Tool™ - Harmonic Isolation Tool (NS.03.38.82.1110,NS.03.60.00.1110)

  • Valid from:

  • June 12, 2017

  • Valid to:

  • June 11, 2018

  • Registered since:

  • June 12, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

NOV Downhole Eurasia Ltd.

DESIGN APPROVAL

Equipment

  • Name:

  • Motor Catch Top Sub (NS.03.60.00.1110)

SUSPENDED

  • Valid from:

  • December 15, 2015

  • Valid to:

  • December 14, 2017

  • Registered since:

  • December 15, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Shanxi Fenglei Drilling Tools Co., Ltd. (Shanxi North Fenglei Industrial Group Co., Ltd.)

DESIGN APPROVAL

Equipment

  • Name:

  • 6-⅝″ OD Landing String Thick Walled Drill Pipe with 6-⅝″ Full Hole Connections (NS.03.30.00.1110 Rev 10)

  • Valid from:

  • March 31, 2017

  • Valid to:

  • March 30, 2019

  • Registered since:

  • March 31, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Smart Drilling GmbH

DESIGN APPROVAL

Equipment

  • Name:

  • ZBE Scout 2000 Rotary Steerable Drilling System (NS.03.60.00.1110, NS.03.38.85.1110, NS.03.65.00.3110, NS.03.38.82.1110)

  • Valid from:

  • September 01, 2016

  • Valid to:

  • August 31, 2018

  • Registered since:

  • September 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Equipment

  • Name:

  • ZBE Scout 3000 Rotary Steerable Drilling System (NS.03.60.00.1110, NS.03.38.85.1110, NS.03.65.00.3110, NS.03.38.82.1110)

  • Valid from:

  • September 01, 2016

  • Valid to:

  • August 31, 2018

  • Registered since:

  • September 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment